PIVOT · Mumbai · DCPR 2034 feasibility

What can this plot become?

Name a plot by its CTS number. PIVOT reads the sanctioned Development Plan for it, runs every DCPR 2034 route that could redevelop it, and builds each one’s area statement: from the plot, through its deductions and FSI, to what is rebuilt for the people there and what is left to sell.

Indicative, from published records, with its working shown on every figure. Permission to develop is granted by MCGM and the planning authorities, never by this tool.

What a run lays outEvery route, same order
  1. The plot
    • Gross plot, from the PRC, conveyance or survey
    • Less road setback and reservation
  2. The FSI
    • Zonal, premium and TDR, by road width
    • Setback TDR, then fungible on top
  3. The split
    • Rehab owed to the people there
    • What is left to sell, as RERA carpet
  4. The deal
    • Costs, premiums and revenue
    • Cash flow, returns and the report
Every line opens to what it was computed from: what you stated, the factor locked for the run and where it came from.Run your plot

Every route stays on the board, and every rule says how far to trust it.

A route that does not fit is never hidden: it names what shuts it. And every rule behind a figure is on a register that says how well it has been checked against DCPR 2034.

Where a route lands

States an area
The plot clears every gate the route sets, and its area statement computes. The multiple shown is the route’s total FSI, fungible left out, over the plot it is struck on. Routes are ranked by what they leave to sell.
Awaiting a fact
The gate is clear, but the statement needs a fact nobody has given it yet, such as the rehab area in an SRA letter of intent. The fact is named. It is never borrowed from another building’s deal.
Ruled out
A statutory minimum or a gateway shuts the route on this plot. It stays on the board with the shortfall stated, so you can check the fact that shut it.

How far to trust it

Checked against the gazette0 of 19 rules
The regulation behind this has been read in the published DCPR 2034 text and our reading matches it.No rule carries this yet. The checking is under way.
From a published summary4 of 19 rules
This figure comes from a published summary of the regulation, not from the gazette itself. The two usually agree; we have not yet confirmed that they do here.
From working practice10 of 19 rules
This is how the regulation is applied in practice on real projects. Nobody has yet traced it to the exact clause in the gazette.
A working convention2 of 19 rules
This is a convention professionals use, not a rule in the regulation. A different professional may use a different one.
Not covered3 of 19 rules
The regulation says something here that we do not yet handle at all. A professional will need to look at this part.

How it works

One plot in. Every route out, with its area statement.

  1. Step 1

    Capture the plot

    One CTS number, or several for an amalgamation. PIVOT resolves each against the Development Plan 2034 parcel base and reads its zone, reservations, road and setback, district and ready-reckoner zone. State the area from the PRC, conveyance or a survey; until you do, the plan’s outline stands in and the board says so.

  2. Step 2

    Read every route on one board

    Each DCPR 2034 route that could redevelop the plot is tested against its gates and, where it clears them, its area statement is built. Ranked by what it leaves to sell, with the ones awaiting a fact and the ones ruled out still in view.

  3. Step 3

    Open a route into a run

    The full statement as a ledger: what you stated, the factors locked for the run with where each came from, and every figure derived from them. Then costs, revenue, the cash flow and the report, with the height checked against SkyGauge.

Four things it will not do.

It never prints a zero for "unknown".

Where a fact could not be established, the figure is withheld and the reason printed. A zero standing in for a missing fact is the most expensive thing a feasibility can say.

It never borrows another building’s bulk.

A route that needs a measured quantity, such as the rehab area in an SRA letter of intent, waits for yours. Ratios may be carried across from a reference deal, labelled as such; absolute areas never are.

It never dresses a convention as law.

Every rule behind a figure sits on a register with its standing: from a published summary, from working practice, or a house convention. The conventions are labelled wherever they are used.

It never calls itself an approval.

The figures are indicative, from published records. What may actually be built is decided by MCGM and the planning authorities, on documents and judgements this tool does not have.

Questions

Answers, with the caveats attached.

Anything the tool cannot establish, it says so on the figure. The same goes for this page.

  • No. It is an indicative feasibility from published records: what the regulations, as we have implemented them, would allow on the facts it holds. What may actually be built is decided by MCGM and the other planning authorities, through their own process.

  • Developers, architects, planners and advisers who need to know what a plot can become, and roughly what it is worth doing, before spending on a survey and a legal opinion.

    If you live in the building and want to know which regulations may apply to it, KYR is the suite’s tool for that, written for members rather than for a deal.

  • The plot from the Development Plan 2034 parcel base; land rates from the Ready Reckoner; the regulations as the engine implements them, each on a register with its standing. The factors a run uses are locked to it, so a run opened next year reproduces the figures it showed today.

  • The engine is tested cell by cell against Anex’s own feasibility workbooks for the routes it models. Where a workbook and the regulation disagree, the regulation wins and the difference is recorded rather than smoothed over.

    The rules are still being checked word for word against the gazetted DCPR 2034 text. The board says how far each one has got.

  • The society’s register and the carpet each member holds today, the building’s age, who owns the land, and anything in a document it has not been given, such as an SRA letter of intent. Without a register the existing society is modelled as empty, so every saleable area is an upper bound, and the board says so.

  • Yes. The tool sits behind sign-in for the whole beta, and first-time access needs an invite code sent by email.

    Codes go out in waves, so one may arrive some time after you create the account.

  • All twenty-four municipal wards, from the parcel base the suite reads: about 430,000 CTS parcels digitised from the Development Plan 2034. Where a parcel is missing from the base, capture says so and you can state the plot yourself.

Invite-only beta

Know what a plot can become before you pay anyone to find out.

PIVOT is the model Anex Advisory uses on its own mandates. It is open to invited developers, architects, planners and advisers while the regulations it cites are grounded clause by clause.

Indicative, from published records. Permission to develop is granted by MCGM, never by this page.